Millennium Information Technologies
Millennium IT Software (Pvt) Ltd, subsidiary of London Stock Exchange is a multinational IT service provider. The old building was retrofitted to a new office as the Network Operating Center. Co-Energi team designed MVAC systems relying on whole building energy simulation to size and optimize the MVAC systems. Project started in April, May 2015. The scope of project was 13,940.5 m2 area with total project value was LKR 487,000.
Services by COE:
-
Building modeling and simulation
-
MVAC system design opimization
-
Commissioning of MVAC systems
Yala Wild Cost Lodge by Resplendent Ceylon
MEP Design Consultancy
Yala Wild Coast Tented Lodge, located adjacent to Yala National Park, was consulted by Co-energi for complete back of house MEP design. Starting from January 2015 the project extended until June 2018 for a scope of 29,739.7 m2. Total project contract was about LKR 3.6 M.
Services by COE:
-
Mechanical ventilation design
-
Plumbing design
-
ETP plant design
-
Electrical
Progress Apparel Bangladesh
MEP Design Consultancy
Located in Shiddhirganj, Bangladesh PDS apparel had 2 identical buildings where Co-energi was consulted as the MEP designer and LEED Consultants for both buildings. The scope of the project included 12,172.3 m2 area with a total value of USD 15.0 M. This project started on May 2016 and concluded on March 2018. Both Buildings were awarded with LEED Gold Certifications.
MAS Casual Line – Mawathagama
MEP Design Consultancy
MAS Casual Line factory in Mawathagama had the AC system design retrofit by Co-energi in December 2015 where the retrofit completed on January 2016. The project scope extended to 13,011.2 m2 area with a total value of LKR 1.1 M.
MAS Ayathi – Biyagama
MEP Design Consultancy
MAS Intimates Designing Centre. The facility promoting its Eco friendly building concept had the AC system design retrofit by Co-energi. The project total value was around LKR 600,000.
MAS Silueta – Biyagama
MEP Design Consultancy
MAS Silueta factory in Biyagama had the MVAC system design retrofit by Co-energi in March 2016 where the retrofit completed on April 2016. The project scope extended to 19,752.3 m2 area with a total value of LKR 1.5 M.
MAS Unichella – Panadura
MEP Design Consultancy
MAS Unichella factory located in Panadura selected Co-energi for MVAC system design retrofit in May 2016. The project scope of 4,398.4 m2 area with LKR 835,000 value wrapped up by June 2016.
MAS Active Linea Intimo
MEP Design Consultancy
MAS Active Linea Intimo facility selected Co-energi for MVAC system design retrofit in. The project valued around LKR 600,000.
British Council – Kandy
MEP Design Consultancy
Co-energi did the MVAC, Mechanical & Total Electrical scope design for British Council Kandy Branch. The project started on September, 2015 and closed up on October 2015. The total project cost was around LKR 745,000 and the project extended to an area of 3.252.8 m2.
Services by COE:
-
Building modeling and simulation
-
MVAC system design
-
Electrical design
-
Commissioning of energy systems
MAS Contour Line – Pallekele
MEP Design Consultancy
Co-energi did the MVAC, Mechanical & Total Electrical scope design for British Council Kandy Branch. The project started on September, 2015 and closed up on October 2015. The total project cost was around LKR 745,000 and the project extended to an area of 3.252.8 m2.
Services by COE:
-
Building modeling and simulation
-
MVAC system design
-
Electrical design
-
Commissioning of energy systems